Location: Home NewsNews
[Back]
Successfully passed the EIA acceptance
Release time:2019-09-20 Source:Ren Jian Bao Gu Views:186

On September 19, 2019, the EIA acceptance expert group visited the company to conduct EIA acceptance work on the 2# production line with an annual output of 400,000 tons.

Production Minister Hu Jiansheng accompanied the EIA acceptance experts to the second production line, inspected the sand bin of the main production building, and understood the operation control status of the production line in the control room. The process, pollutant discharge, pollution source, amount of pollutant discharge, environmental protection measures and investment of the 2# production line project were introduced to the expert group. Experts said that the production line site less dust, all kinds of equipment placed neatly, the control room system is clear and organized, skilled personnel operation, environmental protection procedures are basically complete, better implementation of environmental protection measures, in line with the environmental assessment acceptance standards.

After recognizing the scene investigation, experts also affirmed the environmental protection work of Renjian mortar at the forum, unanimously agreed to pass the acceptance of Renjian mortar 2# production line, and suggested that measures to strengthen dust control and dust reduction can be implemented by keeping the raw material sand reservoir closed at all times and strengthening greening construction.

The successful completion of the EIA acceptance has laid a solid foundation for the sustainable development of the company. Our company will further strengthen the comprehensive management of the environment in strict accordance with environmental standards and requirements, and fight the blue sky defense war.

Home Case News Tel